Concrete plant for production of concrete is located in the plant Ada, 3 kilometers away from Laktaši on the local road Laktaši - Srbac.
Concrete plant was produced in 2002 by Italian manufacturer „IMER GROUP“. The capacity of production of concrete is 60 m3/h. Concrete plant is fully automated. The cages that are separated are filled with naturally washed material of 0-4mm, 4-8mm, 8-16mm, 16-32mm that was washed and sifted in the separation plant.
The concrete plant has two silos for cement, of 60t capacity each. The mixer has a capacity of 1m3 of fresh concrete. In the process of production, the level of humidity of the material is measured and the quantity of water necessary for mixing the concrete is automatically corrected. After the completed production process, the bill of lading is issued by a computer, that contains all necessary data. Another concrete plant Fagram is semi-automatic and the production process has a capacity of 30 m3/h.
The quality of concrete is tested on a daily basis both in IMK Banja Luka and in our own laboratory.
The plant for production of concrete meets all ISO 9001-2000 standards.